News

CMP Annual Report 2012

Mon, 13 May 2013 09:14:00 GMT

CMP Annual Report 2012 is online.

Read more

STMicroelectronics: HCMOS9/BiCMOS9/H9-SOI runs: Postponed to the 10 May 2013

Fri, 05 Apr 2013 15:43:00 GMT

ST has delayed the following runs:
- S13C13_2/S13S13_2/S13I13_2: from 17 April to 10 May.

STMicroelectronics Makes Leading-Edge MEMS Technology Available for Prototyping through CMP

Tue, 19 Mar 2013 09:00:00 GMT

STMicroelectronics and CMP today announced that ST's THELMA MEMS manufacturing process, the process ST uses for its industry-leading accelerometers and gyroscopes, which have shipped in billions of units, is now available for prototyping to universities, research labs and design companies through the silicon brokerage services provided by CMP.

Read more

STMicroelectronics Makes Analog 130nm H9A CMOS Process Available Through CMP

Thu, 07 Mar 2013 15:00:00 GMT

STMicroelectronics and CMP today announced that ST's CMOS H9A process (at 130nm lithography node), which offers a large panel of analog and digital devices, is now available for prototyping to universities, research labs and design companies through the silicon brokerage services provided by CMP.

Read more

Latest annual meeting: 17 January 2013

Tue, 26 Feb 2013 14:35:00 GMT

The annual CMP users meeting took place on 17 January 2013 in Paris at ASIEM.
See the slides presented during the meeting.

An introduction to FD-SOI

Thu, 31 Jan 2013 16:02:00 GMT

See video

STMicroelectronics in Cooperation with Soitec Makes 28nm FD-SOI CMOS Process Available Through CMP

Thu, 18 Oct 2012 15:03:00 GMT

STMicroelectronics, Soitec and CMP today announced that ST's CMOS 28nm Fully Depleted Silicon-On-Insulator (FD-SOI) process, which uses innovative silicon substrates from Soitec, is now available for prototyping to universities, research labs and design companies through the silicon brokerage services provided by CMP.

Read more

S28C12_5 putted forward to November the 19th

Tue, 04 Sep 2012 15:14:00 GMT

ST has putted forward the S28C12_5 run of 2 weeks. Deadline is now November the 19th.

S28C12_4 run canceled

Mon, 23 Jul 2012 16:37:00 GMT

ST has canceled the S28C12_4 run of August.

S28C12_2 run canceled

Tue, 17 Apr 2012 10:21:00 GMT

ST has canceled the S28C12_2 run.

All the News
RSS Feed